JBS Avoids Plant Expansion, Capex Expenditure

There was variability in boiler operation by the shift operators, and the boilers were not monitored or optimized for production.

JBS case study image

Cleaver-Brooks provided the customer with a complete boiler island consisting of two D-type packaged steam boilers and all auxiliary equipment. Our in-house combustion expertise ensured that all equipment performed safely and reliably.


Challenge:

A Boiler Plant Optimization™ Overview identified deficiencies along with opportunities to optimize the boiler system, but the company wanted hard data to justify the required capital expense.

Solution:

Data and trending reports generated by the Prometha® smart device for boilers enabled company executives to visualize inefficiencies, and they approved the proposed upgrades.

Results:

Reduced the number of boilers from six continually operating at max fire to four operating at full fire or less, despite an increase in plant demand and 30° F increase in water temperature.


Discover More

Tundra sym 2

Education & Training

Cleaver-Brooks has a dedicated Training Department offering web-based programs, co-sponsored authorized representative regional programs, custom on-site programs at the customer’s facility, and programs held at Cleaver-Brooks facilities.

Learn More
thv_afmkt_Nov2012 (28)

Genuine Parts

Purchasing Cleaver-Brooks Genuine Parts is the best way to keep your boiler system operating at peak performance. Our parts are precision-engineered to fit your boiler, and they are rigorously tested for quality to ensure your boiler runs safely and reliably.

Shop Now
Mobile steam pic web small

Rental Solutions & Services

Our rental solutions provide for: capacity increases, peak demand, plant or steam outages, equipment shutdown due to inspection, retrofit or repair, and redundancy or disaster response contingency plans.

Learn More